
Project Details
Housing one of the largest tri-generation plants in Australia, Majura Central Energy (formerly known as Aeropark) was constructed at the Majura Office Park in Canberra. The plant was designed to supply chilled water, heating hot water and cooling water to the surrounding buildings at 1 Wellington Place, 5 Wellington Place,11 Lancaster Place and 15 Lancaster Place.
Awarded the project contract, Benmax installed the tri-generation system that has a cooling capacity of 5300kWR, including the absorption chiller, and a heating capacity of 3900kW from the natural gas fired boilers. Additional heating can be obtained from the heat rejected by the 1000kW natural gas generator. The project was successfully completed in 2008.
HVAC design specialists since 1986. Best practice is our standard.
We design, build and maintain specialised mechanical systems for commercial and industrial facilities to provide healthy, safe and efficient indoor environments for people to live, work and play. We’ve spent three decades building our reputation. We’ve done that by doing a good job, and getting another job.
Your local HVAC specialists
© Copyright 2023 Benmax Pty Ltd | Website developed by The Marketing GP
Legalities
Benmax acknowledges and pays respect to the past, present and future Traditional Custodians and Elders of this nation and the continuation of cultural, spiritual and educational practices of Aboriginal and Torres Strait Islander peoples.
We wish to acknowledge the Ngambri people, traditional custodians of the beautiful land on which our Headquarters resides.