Project Details
Working alongside Apollo Projects, Benmax completed the mechanical services for the 2,400 sqm plastic injection moulding facility located in Rolleston, Canterbury.
The design and build project included machine cooling and compressed air packages, along with heating and cooling for office spaces and a custom designed moulding shop. Importantly, the 5,400 cubic metre moulding shop would require ISO 7 Cleanroom Certification on completion to ensure the safe fabrication of plastic materials for the infant food industry.
The use of 3D modelling during the design phase was critical to meet the exacting design and installation needs of the project. This process enabled the team to optimise pipe and duct layouts to avoid the use of seismic restraints (in line with NZ building codes) and to find valuable time and budget savings while successfully delivering works within the tight space restrictions of the factory.
Following the success of the project in Rolleston, Benmax was further engaged by Tekplas Ltd to complete design and installation works on their new headquarters, and larger factory facility, in Hamilton on the North Island.
HVAC design specialists since 1986. Best practice is our standard.
We design, build and maintain specialised mechanical systems for commercial and industrial facilities to provide healthy, safe and efficient indoor environments for people to live, work and play. We’ve spent three decades building our reputation. We’ve done that by doing a good job, and getting another job.
Your local HVAC specialists
© Copyright 2023 Benmax Pty Ltd | Website developed by The Marketing GP
Legalities
Benmax acknowledges and pays respect to the past, present and future Traditional Custodians and Elders of this nation and the continuation of cultural, spiritual and educational practices of Aboriginal and Torres Strait Islander peoples.
We wish to acknowledge the Ngambri people, traditional custodians of the beautiful land on which our Headquarters resides.