The Mechanical services are critical in maintaining reliable, fast, and efficient performance for the server equipment. To create the right environment, the data center was fitted with a comprehensive HVAC system that delivers constant, ideal air conditions. With the implementation of the N+1 redundancy, the data center contains a constant, cool environment that is conducive to our client’s mission-critical servers and operations. 
To provide optimum conditions for server operation and minimize downtime due to server failure, the HVAC system provides appropriate airflow, temperature and humidity. Redundancy features provide additional protection for Centrelink’s critical operations.

project overview

Client:   Centrelink
Year Completed: 2008
Project Type:  Data Centre

project features

  • Chilled water system upgrade
  • Process cooling unit replacement and upgrade
  • New environmental monitoring system (EMS)